Перейти к основному содержимому

Critical path / deferred tail

Generated from pattern-library/registry.json — do not edit by hand; change the registry and run bun run patterns:build.

Category: Runtime Velocity · Tier: deep · Maturity: proven (verified 2026-09-09 @ 921e8266-dirty) · Risk: medium — work moved off the response must be genuinely optional to it

Only work the caller's intent depends on runs before the response; analytics, indexing, outbox routing and telemetry run after it through one wrapper that owns the platform's survival rule and the catch-before-handoff rule.

When to use: Use whenever an operation performs secondary effects before returning. Not for a durable write that must be acknowledged before the response.

Avoid when

  • The side effect is a durable write the caller must see acknowledged — that is critical work, not a deferred tail
  • The work is not idempotent, so a platform retry of the spawning request would apply it twice
  • The work is heavy enough to be background class (exports, media processing, AI enrichment) and should not ride the response's tail

Alternatives

  • await the effect inline before responding — prefer when the effect is cheap and its failure must reach the caller
  • a background job or outbox drained by a worker — prefer when the work is heavy, must outlive the request, or needs retries with its own schedule
  • streaming deferral with safeDeferPromise — prefer when the result belongs inside the response body and should stream in after the first bytes

Docs

Code

  • src/lib/server/platform/after-response.ts — deferAfterResponse — the one place the rules live (GitHub · GitLab)
  • src/lib/server/analytics/collector.hook.ts — The largest consumer: pageviews, bot hits, user events (GitHub · GitLab)

Tests

  • src/lib/server/platform/after-response.test.ts (GitHub · GitLab)

Proof

Invariants

  • Deferred work is never necessary for the correctness of the returned result.
  • The .catch is attached BEFORE the promise is handed to the platform — attached after, an unhandled rejection can take the serverless process down (SvelteKit #9785).
  • Deferred failures are logged, never rethrown: the response is gone and there is nobody to tell.
  • Deferred work is idempotent — delivery is at-least-once and the platform may retry the request that spawned it.
  • A durable write that must be acknowledged before the response is critical, not deferred.

Emulation notes

  • On Vercel the execution environment FREEZES when the response returns: a bare un-awaited promise is not merely unordered, it is not guaranteed to run at all. Off-platform the same wrapper degrades to plain fire-and-forget, which is correct there.
  • Keep this separate from streaming deferral (safeDeferPromise), which keeps a promise alive INSIDE a response body. Two lifetimes, two files — one file holding both is how buckets start.
  • Name the deferred work for the effect (analytics:pageview), not the mechanism: the label is what someone reads in a failure log at 3am.

Depends on


Machine-readable record: critical-path-deferred-tail in pattern-library/registry.json.

← Back to Pattern Library

Думаете, этот паттерн можно сделать лучше? Расскажите как.

Оставить отзыв